| Created: | 08.07.2020 10:33:24 |
| Modified: | 25.11.2021 14:15:12 |
Project: |
|
Advanced: |
|
| Element | Source Role | Target Role |
|
AreaLocation Class |
Name: |
Name: isAreaLocatedAt |
Details:
The line-side construction has an area location. Appropriate for dual-track tunnels or bridges over several tracks.<br/>
|
||
|
LinearLocation Class |
Name: |
Name: isLinearLocatedAt |
Details:
The line-side construction has a linear location. Appropriate for constructions like a noise wall or a single-track tunnel.<br/>
|
||
| Property | Value |
| isFinalSpecialization: | 0 |
| Object | Type | Connection | Direction | Notes |
| GE-04 - EquipmentTypeOverbridge | Requirement | Realization | To | |
| TunnelTube | Class | Generalization | From | |
| GE-0601 - BridgeNumber | Requirement | Realization | To | |
| GE-0401 - BridgeNumber | Requirement | Realization | To | |
| GE-07 - EquipmentTypeViaduct | Requirement | Realization | To | |
| GE-1402 - Technical area designation | Requirement | Realization | To | |
| Tunnel | Class | Generalization | From | |
| GE-0501 - BridgeNumber | Requirement | Realization | To | |
| GE-1401 - Technical area type | Requirement | Realization | To | |
| GE-14 - Technical area | Requirement | Realization | To | |
| GE-0701 - BridgeNumber | Requirement | Realization | To | |
| Flyover | Class | Generalization | From | |
| CivilStructure | Class | Generalization | To | |
| GE-05 - EquipmentTypeTunnel | Requirement | Realization | To | |
| GE-06 - EquipmentTypeUnderbridge | Requirement | Realization | To |