prepared for being taken into service : Public Class
Created: 17.05.2018 14:14:12
Modified: 08.09.2022 12:43:10
Project:
Advanced:
The asset that owns this configuration-status has been physically modified or built in preparation for a later phase of construction. The signalling system is unaware of this modification and does not control it. Typical example is the addition of a speed indicator that will be taken into service at a later date.<br/>
Property Value
isFinalSpecialization: 0
Object Type Connection Direction Notes
OutOfService Class Generalization To