Element | Source Role | Target Role |
Organisation Class |
Name: |
Name: isCreatedByOrganisation |
![]() The design organisation, engineering company, that created the plans for this group of plans.<br/>fr-FR: bureau d'études (champ obligatoire)<br/>de-DE: Ingenieurbüro<br/>
|
||
Line Class |
Name: |
Name: refersToProjectReferenceLine |
![]() This group of project stages is centered on this line.<br/>de-DE: fuehrende Strecke<br/>en-UK: Engineer's Line Reference.<br/>Definition of the leading line supports orienting and plotting layout plans according to rules such as "the project plan shall be drawn such that the leading line plots with kilometrage counting up from left to right" or "London to the left", or "Paris à gauche, kilomètre 0".<br/>
|
||
Organisation Class |
Name: |
Name: isOwnedByOrganisation |
![]() The sub-organisation of the IM or regional organisation of the IM that is responsible for, and owns the plans and data.<br/><br/>This allows addressing the correct organisation.<br/><br/>SNCF: signifie la région en <i>possession des plans </i>(champ obligatoire)<br/><br/>
|
||
ProjectMetaData Class |
Name: splitsIntoGroupMetaData splits into group meta-data |
Name: |
![]() The project meta-data splits into one or more groups of meta-data. <br/>
|
||
OperationalLocality Class |
Name: |
Name: hasReferenceOperationalLocality |
![]() Reference to the locality to which the meta-data apply. This links the project to company-wide planning and documentation. E.g. Projet Grand Paris<i>.</i><br/>
|
Element | Source Role | Target Role |
AreaLocation Class |
Name: coversPlanningArea |
Name: |
![]() Area where the actual engineering is carried out. Changes to objects are allowed and to be expected within this area.<br/>de-DE: Planungsbereich<br/>
|
||
AreaLocation Class |
Name: coversObservationArea |
Name: |
![]() This group of planning stages covers the given observation area. The objects in this area cannot be changed.<br/>de-DE: Betrachtungsbereich<br/>
|
||
ProjectStageMetaData Class |
Name: splitsIntoStageMetaData |
Name: |
![]() The property group splits into meta-data for this single stage.<br/>
|
||
DateTimeDescription Class |
Name: hasDateOfCompletion |
Name: |
![]() The planned date of completion of this group of project stages.<br/>Supports project managers to forecast, timely ordering, and resource planning.<br/>
|
||
Attachment Class |
Name: hasRequirementSpecification |
Name: |
![]() Document describing the scheme requirements, operational objectives.<br/>e.g. "increase speed on Dresden - Leipzig to 200 kmh" <br/>This helps the supplier to design requirement validation tests.<br/>
|
Property | Value |
isFinalSpecialization: | 0 |
Object | Type | Connection | Direction | Notes |
PM-0809 - Department responsible for inventory plans | Requirement | Realization | To | |
PM-0801 - Leading operational locality | Requirement | Realization | To | |
PM-0806 - XSD version | Requirement | Realization | To | |
PM-0814 - Planning group title block | Requirement | Realization | To | |
PM-0817 - Designation planning group | Requirement | Realization | To | |
PM-0807 - Planning group special type | Requirement | Realization | To | |
PM-0820 - Polygons observation area | Requirement | Realization | To | |
PM-0805 - Date of completion planning group | Requirement | Realization | To | |
PM-0803 - Planning group general attributes | Requirement | Realization | To | |
PM-0823 - Polygons planning area | Requirement | Realization | To | |
PM-0811 - Line section | Requirement | Realization | To | |
AreaLocation | Class | Strong | From | Area where the actual engineering is carried out. Changes to objects are allowed and to be expected within this area. de-DE: Planungsbereich |
PM-0812 - Line kilometer | Requirement | Realization | To | |
ProjectMetaData | Class | Strong | To | The project meta-data splits into one or more groups of meta-data. |
PM-0701 - Planning group meta data | Requirement | Realization | To | |
PM-0802 - Single planning step meta data | Requirement | Realization | To | |
PM-0804 - Attachment operational task | Requirement | Realization | To | |
PM-0818 - Designation sub-facility (controller) | Requirement | Realization | To | |
PM-0810 - Planning group leading line | Requirement | Realization | To | |
AreaLocation | Class | Strong | From | This group of planning stages covers the given observation area. The objects in this area cannot be changed. de-DE: Betrachtungsbereich |
BaseObject | Class | Generalization | To | |
ProjectStageMetaData | Class | Strong | From | The property group splits into meta-data for this single stage. |
PM-08 - Planning group meta data | Requirement | Realization | To | |
PM-0819 - Planning office | Requirement | Realization | To | |
DateTimeDescription | Class | Strong | From | The planned date of completion of this group of project stages. Supports project managers to forecast, timely ordering, and resource planning. |
PM-0815 - Section of construction | Requirement | Realization | To | |
Attachment | Class | Strong | From | Document describing the scheme requirements, operational objectives. e.g. "increase speed on Dresden - Leipzig to 200 kmh" This helps the supplier to design requirement validation tests. |
PM-0808 - Discipline | Requirement | Realization | To | |
PM-0816 - Designation facility (central unit) | Requirement | Realization | To | |
PM-0813 - Line number | Requirement | Realization | To |