: Public Requirement
Created: 01.10.2019 19:35:29
Modified: 22.11.2019 14:17:17
Project:
Advanced:
Verweis auf das Signal, für welches die INA-Berechnung (PZB 90) durchgeführt wurde.<br/><br/>ID_Signal<br/>
Requirement Type Status Difficulty Priority Stability
AlternativeTranslationOrComment Meta Requirement        
Details:
 
AttributeName Meta Requirement        
Details:
ID Signal<br/>
AttributeNameDE Meta Requirement        
Details:
ID_Signal<br/>
BasicType Meta Requirement        
Details:
TGUID<br/>
Category Meta Requirement        
Details:
Design<br/>
Comment Meta Requirement        
Details:
 
CommonCernel Meta Requirement        
Details:
 
CommonKernel Meta Requirement        
Details:
(x)<br/>
DBNetz_Applicable Meta Requirement        
Details:
M<br/>
DBNetz_PlanPro1_8_0 Meta Requirement        
Details:
ID Signal<br/>
Default Meta Requirement        
Details:
Signal|Proxy object<br/>
Description Meta Requirement        
Details:
Verweis auf das Signal, für welches die INA-Berechnung (PZB 90) durchgeführt wurde.<br/>
ElementType Meta Requirement        
Details:
A<br/>
FachlicheBeschreibung Meta Requirement        
Details:
Verweis auf das Signal, für welches die INA-Berechnung (PZB 90) durchgeführt wurde.<br/>
ID Meta Requirement        
Details:
TP-0907<br/>
Infrabel_Applicable Meta Requirement        
Details:
 
Infrabel_railml Meta Requirement        
Details:
 
NetworkRail_Applicable Meta Requirement        
Details:
NA<br/>
NetworkRail_SDEF Meta Requirement        
Details:
 
ObjectName Meta Requirement        
Details:
Intermittent train protection element assignment<br/>
ObjectNameOrAttributeGroup Meta Requirement        
Details:
Intermittent train protection element assignment INA<br/>
Priority Meta Requirement        
Details:
1<br/>
ProRail_Applicable Meta Requirement        
Details:
NA<br/>
ProRail_IMSPOOR1_0_0 Meta Requirement        
Details:
 
RFI_Applicable Meta Requirement        
Details:
 
RFI_InRete2000 Meta Requirement        
Details:
 
SNCF Meta Requirement        
Details:
 
SNCF_Applicable Meta Requirement        
Details:
NA<br/>
SubCategory Meta Requirement        
Details:
Engineering<br/>
WorkPackage Meta Requirement        
Details:
Intermittent train protection<br/>
Property Value
isFinalSpecialization: 0
Object Type Connection Direction Notes
RequirementsPlaceholder Class Realization From due to disappear in PlanPro 1.9